Electrical Installation and Maintenance of In-Ground Electrical Distribution Systems


  • VBC East Prime Power


    Location: Baghdad, Iraq

    VBC East Prime Power

    The VBC East project consisted of a Prime Power site and extensive overhead distribution network to be designed and constructed. This site also had the added complexity of requiring two large switchgear systems, the first rated at 40 MW at 11KV and the second, the main load sharing switch, 100MW at 11 KV.

    Project Details

  • VBC West Prime Power


    Location: Baghdad, Iraq

    VBC West Prime Power

    Arkel managed design and installation of the entire plant, including design and construction of the main power site, 12 Kilometers of 11KV overhead network and 21 HV substations.

    Project Details
  • Electrical Construction Works for Process and Injection Water Supply System

    Arkel is providing Installation of generator sets and synchronization panel, switchgear, transformers, instrument air compressor, dryer and tank and instrument on lines.

    Project Details