Construction of Infrastructure Facilities (MEI Camp)

Location: Majnoon Oil Field, Basra, Iraq
This project consisted of the infrastructure facilities to support the future production plant on the Majnoon Oil Field near Basra, Iraq. These facilities included a sewage treatment plant, incinerator and waste management facility, and fuel dispensing station. Arkel also installed two warehouses, clinic, fire shed, chemical storage building and other support buildings. Arkel installed an access point that includes vehicle and pedestrian airlocks for entry into the production facility. Arkel was responsible for the earthworks, concrete and utility scopes for all locations.